andorralistings

Property · Buy · Andorra la Vella

Property · Andorra

€920,894119 m² · 3 bedrooms · 3 bathrooms

Description

About It is a new construction on the 3rd floor under construction with 119.38 m² built, featuring a hall, 3 bathrooms, a large living-dining room, open kitchen, 3 bedrooms with 2 en-suite bathrooms and 3 terraces. Parking spaces are not included in the apartment price. They are sold separately starting at €36,000, and 2 spaces must be purchased. The storage room is also sold separately, starting at €20,000, on request. Multifamily housing integrated in a single building, located on Calle Antiguo Camino Real, in the new development area of Andorra la Vella, facing the Andorra la Vella municipal stadium and Camino Riu Valira, close to the new bus station. The building has a single access from Calle Antigua Camino Real. The area where the building is located has educational, cultural, sports, social, commercial, and service facilities, in an urban environment built with multifamily and administrative buildings. The building will be constructed with the aim of achieving good energy efficiency, while taking care of the environment, quality, and climate comfort of the home. To reduce energy consumption, the facade, roof, and interiors have been designed with a high level of insulation in the closures to avoid thermal bridges. Optimal acoustic insulation has also been chosen. The floor coverings will be laminated from Eureka, class AC6 and 12 mm thick, with a white lacquered skirting board finish. The walls will be coated with smooth plastic paint, with a color defined according to the property. A plasterboard false ceiling will be installed, also coated with smooth plastic paint. The bedroom and hall will be equipped with a white lacquered built-in wooden wardrobe. All doors, hinged and sliding, will be lacquered white, except for the glass doors, which will be treated as translucent if the property requests. The walls and floor of the bathroom will be clad with Keraben porcelain. Single-lever faucets with a water- and energy-saving system will be installed. Kitchen: The kitchen will be paved with stoneware with the same characteristics as the bathroom, while the remaining walls will be covered with a double layer of white plastic paint. The false ceiling will be a humidity-resistant laminated plaster with a smooth finish in plastic paint. It will be delivered furnished, with a modern high-and-low furniture design. The wall units will integrate an LED strip for better illumination of the work area. The fronts and worktops will be finished in Dekton. The kitchen will include the following equipment: Induction hob Pyrolytic oven Microwave Extractor hood Stainless steel sink with single-lever faucet - Air conditioning The apartment’s heating installation is planned with underfloor heating in all rooms, with higher density in areas where heat loss is expected. The apartment will have a programmable thermostat for the living room. It will also be equipped with pre-installation up to the roof for the future installation of an air conditioning system. - Payment terms - 10% reservation - Purchase contract at 25% (1 month after reservation) - 25% fundamentals - 25% cover - 15% signing Expected delivery: Summer 2028 [IW] More information See more

Features

  • Terrace
  • Balcony
  • Air conditioning
  • Parking
  • Furnished
  • Heating
  • Storage room